Produits
- Équipement de contrôle solides
- Triple Deck Shale Shaker
- Mouvement linéaire Shale Shaker
- Dégazeur sous vide
- La boue nettoyant
- Désableur
- Débourbeur
- Décantation Centrifuge
- Sludge Vacuum Pump
- Verticale coupe sèche
- Séchage Shale Shaker
- Jet Mud Mixer
- Agitateur de boue
- Pompe centrifuge
- Pompe de cisaillement
- Pompe à lisier submersible
- Pistolet de boue
- Séparateur de gaz de boue
- Dispositif d'allumage de feu
- Pompe à vis
- Réservoir d'hydratation
- Réservoir de boue
- Salle du centre de contrôle de moteur
- Convoyeur à vis
- Offshore Mud Skip Container
- Barite Bulk Silo
- Système de contrôle de matières solides
- Pièces de rechange
Contact
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Cas
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Nouvelles de la société
250GPM HDD Mud Recovery System Delivered To Customer
2021-01-21
On January 15, Brightway one set 250GPM HDD mud recovery system was officially delivered to a country in Southeast Asia.
The HDD mud recovery system is used to solve the mud treatment problem of the underground sewage pipe network project for the customer. According to the customer's construction site conditions, Brightway designed and customized this 250GPM HDD mud recovery system for customers. The system adopts the integrated double deck screen machine to meet the user's on-site mud treatment needs and reduce investment in other equipment, save construction cost. After operation, the capacity of system is up to 50-60 cubic meters per hour.
Brightway has worked with this customer many times, Customers have always recognized and trusted the mud treatment solutions and systems in the HDD drilling field of Brightway. At present, the system is expected to arrive at the customer's construction site at the end of next month for installation and operation.
Précédent :Delivery of 2 sets of Drilling Fluid Circulation System to customer
Prochaine :Happy Chinese Lunar Spring Festival 2021