Produits
- Équipement de contrôle solides
- Triple Deck Shale Shaker
- Mouvement linéaire Shale Shaker
- Dégazeur sous vide
- La boue nettoyant
- Désableur
- Débourbeur
- Décantation Centrifuge
- Sludge Vacuum Pump
- Verticale coupe sèche
- Séchage Shale Shaker
- Jet Mud Mixer
- Agitateur de boue
- Pompe centrifuge
- Pompe de cisaillement
- Pompe à lisier submersible
- Pistolet de boue
- Séparateur de gaz de boue
- Dispositif d'allumage de feu
- Pompe à vis
- Réservoir d'hydratation
- Réservoir de boue
- Salle du centre de contrôle de moteur
- Convoyeur à vis
- Offshore Mud Skip Container
- Barite Bulk Silo
- Système de contrôle de matières solides
- Pièces de rechange
Contact
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Cas
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Nouvelles de la société
Jidong Oilfield Drilling Waste Disposal System Delivery
2020-06-16
Recently, Brightway produced drilling waste disposal system for Jidong Oilfield affiliated units. This equipment includes 2 sets of vertical cuttings dryer and 3 sets of decanter centrifuge. The final installation and commissioning work is currently in progress and is expected to be delivered to customers in the short term.
Most of the drilling projects in Jidong Oilfield are located near the offshore areas and shrimp ponds. In order to protect the ecological environment, Jidong Oilfield has been actively advocating and practicing green drilling, and adopted corresponding environmental protection measures for each well in the drilling construction. Among them, for the waste drilling fluid generated by drilling and waste mud treatment, the oil field has invested a batch of special treatment equipment, namely drilling waste disposal system. The equipment that Brightway produced for customers this time is an important cooperation that helps the environmental protection construction of Jidong Oilfield.
At present, the decanter centrifuge has been completed, and the drill cuttings dryer project has been completed 90%, Brightway workers are doing the final installation and commissioning work, it is expected to be sent to the oilfield drilling site by the end of this month. Know more about oilfield environmental protection equipment or to consult drilling waste disposal system, please click the link:http://www.brightwaysolids.com/Drilling-Waste-Management_d13
Précédent :250bbl Water Based Mud Plant for Drilling Rig
Prochaine :12500bbl Liquid Mud Plant in Mid-East