Accueil > CBM et des cas de système de puits géothermiques

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Cas

CBM et des cas de système de puits géothermiques

ZJ30 750HP CBM Drilling Rig Mud System in China

2025-01-10

 

ZJ30 750HP CBM Drilling Rig Mud System in China

 

This coalbed methane drilling rig solid control system is designed to support the ZJ30-series 750HP drilling rig. The system includes equipment such as shale shaker, desander, desilter, centrifuge, mixing tank, and storage tank. It can meet the needs of mud purification and circulation during coalbed methane drilling operations.

 

ZJ30 750HP CBM Drilling Rig Mud System in China

 

Know more details from the page:  https://www.brightwaysolids.com/CBM-drilling-Mud-System_p47.html

 

Précédent :BWSP-250 Desanding Plant Pipe-jacking Project in Malaysian

Prochaine :BWMRS-120 HDD Mud Recycling System in Indonesia

Formulaire de rétroaction

* Votre nom:
* Messagerie:
* Société:
* Da:
* Numéro de téléphone:
* Message: