Accueil > Cas

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Cas

Cas

  • Oil Drilling Waste Management Matching With Drilling Mud System 2017-05-18

      Oil Drilling Waste Management Matching With Drilling Mud System The Oil Drilling Waste Management is Matching With ZJ40 Drilling Mud System. The Capacity is up to 50T/h. It is composed of Cuttings Dryer and Decanter Centrifuge. That is the core Equipmen...

  • Drilling Cuttings Dryer on Inner Mongolia Site 2017-05-18

     Drilling Cuttings Dryer on Inner Mongolia  Site  The Drilling Cuttings Dryer will be match with screw conveyer and other drilling mud system in oilfield and achieve  drill cuttings drying. The cuttings dryer capacity can be up to 40t/h. Ap...

  • Solids Control System for ZJ50 Drilling Rig in India 2017-05-18

    Solids Control System for ZJ50 Drilling Rig in India This system is designed and customized according to customer demand. It will be matching with ZJ50 Drilling Rig of ONGC ((Oil and Natural Gas Corporation) and be used for processing and recycling of oil dril...

  • Kazakhstan pétrole et gaz en cas de projet de système de forage 2014-12-31

    Forage système cas Kazakhstan ZJ50 pétrolier et gazier Kazakhstan ZJ50 forage pétrolier et gazier boue système spécification AS ci-dessous :2 ENSEMBLES SHALE SHAKER, BWZS70 - 3P. 1 ENSEMBLE VIDE DÉGAZEUR, BWZCQ270. 1JEU DÉSABLEUR, BWCSQ250-2 S. 1JEU DÉBOURBEUR...

  • 500 GPM Mud Recycling System in India 2017-05-20

    500 GPM Mud Recycling System in India 500GPM HDD Mud Recycling System is composed of one unit shale shaker,one unit mud cleaner,one unit mud tank, one unit jet mud mixer and three sets centrifugal pumps. Besides, In order to guarantee the smooth construction, ...

  • Projet de système de boue HDD de Thaïlande 2014-12-30

    Cas de la Thaïlande disque dur système de boue Thaïlande 1000 GPM boue système (2 jeux) spécification en tant que ci-dessous :2 ensembles de schiste SHAKER, BWZS70 - 3P, 2X1.5 KW moteur, 3screens avec une superficie de 2,1 ㎡.1 jeu de boue nettoyant, BWZJ70-2S1...

  • SHANXI province CBM et système géothermique bien cas 2014-12-30

    Province du SHANXI CBM bien système cas ShanXi CBM boue système spécification en tant que ci-dessous : 2 ENSEMBLES SHALE SHAKER, BWZS70 - 3P. avec moteur anti-déflagrant OLI.1 jeu de boue nettoyant, BWZJ70-2S12N, la combinaison de débourbeur et de desander. 3 ...

  • Malaisie Tunnel Boring Machine boue système cas 2014-12-30

    Malaisie Tunnel Boring Machine boue système cas Malaisie Tunnel Boring Machine boue système spécification en tant que ci-dessous : (SYSTÈME DE BOUE DE 9 ENSEMBLES)SHAKER DE 2 ENSEMBLES DE SCHISTE. (Shaker grossière et Fine Shaker)1JEU unité de DÉBOURBEUR et de...

Formulaire de rétroaction

* Votre nom:
* Messagerie:
* Société:
* Da:
* Numéro de téléphone:
* Message: